Renovated kitchen in an Ottawa home with new cabinets and stone countertops
Kitchen renovations

Kitchen Renovations Ottawa

We rebuild Ottawa kitchens around how the room is actually used — where you prep, where the kids land, where the coffee lives. Cabinets, counters, tile, and finish work handled by one crew with a fixed price agreed before we start.

Scope

What the work covers

Cabinets supplied and installed

New boxes, refacing, or a hybrid — levelled, shimmed, and scribed to walls that are never actually straight.

Countertops and backsplash

Quartz and stone templated after cabinet install, plus tile backsplash cut around outlets rather than around them.

Flooring and transitions

Tile, hardwood, or luxury vinyl over a levelled subfloor with clean transitions into adjoining rooms.

Lighting

Pot lights, under-cabinet strips, and pendant placement planned for the prep zones, not the ceiling grid.

Plumbing fixtures

Sinks, faucets, and dishwasher hook-ups reconnected and pressure-tested before the crew leaves.

Trim, paint and details

Toe kicks, crown, casing, and cut-in paint lines that make the cabinetry look built-in instead of dropped in.

Budgeting

How projects are scoped

Refresh
Cabinet refacing or painting, new counters, backsplash, hardware, and paint. Layout stays as-is.
Full replacement
New cabinets and counters, flooring, lighting, and fixtures with the existing footprint kept.
Layout change
Wall removal, relocated sink or range, structural work, permits, and inspections included in the plan.
Materials
You choose the cabinet line, counter slab, and tile. We price the exact selections so nothing shifts later.

Every quote is a fixed written number tied to the selections you approve. If you change a material mid-project, you get the revised cost in writing before we order it.

Process

What to expect, week by week

01

Measure and design

In-home measure, layout options, and cabinet selection so the order can go in early.

02

Demolition

Old kitchen out, floors and doorways protected, dust contained to the work zone.

03

Rough-in and install

Any plumbing and lighting changes, then cabinets set and counters templated.

04

Finish and walkthrough

Backsplash, trim, paint, fixtures, and a punch list we close out together.

FAQ

Questions Ottawa homeowners ask

How much does a kitchen renovation cost in Ottawa?

It depends almost entirely on cabinets and countertops. A refacing-and-refresh job sits far below a full gut with new layout and stone counters. We measure your kitchen, price the exact materials you pick, and hand you one written number before any demolition starts.

How long will my kitchen be out of use?

Plan on three to six weeks for a full kitchen. Cabinet lead times drive the schedule more than the labour does, so we order early and only start demolition once your cabinets have a confirmed delivery date.

Can you keep my existing layout?

Yes, and it is often the smarter spend. Keeping sinks and appliances roughly where they are avoids moving plumbing and lets more of your budget land on cabinets, counters, and finish work you actually see every day.

Do you handle permits for kitchen work?

Cosmetic replacement rarely needs one. If we are removing a wall or changing the structure, we tell you up front, sort the City of Ottawa permit, and build the inspection into the schedule instead of surprising you mid-project.

Can we live at home during the renovation?

Most of our Ottawa clients do. We seal the work zone, protect the path in and out, and help set up a temporary kitchen with the fridge, microwave, and kettle somewhere usable.

Get a fixed, written quote

Tell us about the space and we'll get back to you within one business day.

Request your quote