Slate-look floor tile dry-laid in an Ottawa bathroom before installation
Bathroom renovations

Bathroom Renovations Ottawa

Bathrooms are the least forgiving room in the house — one shortcut behind the tile and you pay for it years later. We build Ottawa bathrooms with proper waterproofing, honest ventilation, and tile work that still looks tight a decade in.

Scope

What the work covers

Tiled showers and tubs

Custom curbs, benches, niches, and slope built before the membrane, so the drainage actually works.

Waterproofing

Bonded membrane on every wet surface, sealed corners and penetrations, and a flood test before tiling.

Vanities and fixtures

Vanity, top, faucet, toilet, and glass supplied and installed, with clearances checked against the door swing.

Ventilation corrected

Fan sized for the room, ducted to the exterior, and insulated so it does not drip in an Ottawa winter.

Floors and heat

Levelled subfloor, uncoupling membrane, and tile laid to a layout planned around the fixtures.

Paint and trim

Moisture-tolerant paint, casing, baseboard, and caulk lines cut clean where tile meets everything else.

Budgeting

How projects are scoped

Refresh
New vanity, toilet, tile floor, mirror, lighting, and paint with existing plumbing locations kept.
Full gut
Everything to the studs, new waterproofed shower, tile, fixtures, ventilation, and finishes.
Layout change
Moving the tub, shower, or toilet — new drain and supply runs, framing, and inspections.
Materials
Tile, glass, vanity, and fixture selections priced to what you actually choose, not a placeholder allowance.

You get one written number covering labour and the materials you selected. Anything discovered behind the walls — rot, old plumbing, missing venting — is quoted in writing before we proceed.

Process

What to expect, week by week

01

Measure and select

In-home measure plus tile, vanity, and fixture selections so ordering happens before demo.

02

Demo and rough-in

Strip to studs, correct any plumbing and venting, and inspect what the old build hid.

03

Waterproof and tile

Pan, membrane, flood test, then wall and floor tile with proper cure time between stages.

04

Fixtures and finish

Vanity, glass, trim, paint, and a walkthrough where we close out the punch list.

FAQ

Questions Ottawa homeowners ask

What does a bathroom renovation cost in Ottawa?

A main-bath refresh with a new vanity, toilet, tile floor, and paint is on the lower end. A full gut with a custom tiled shower, niches, glass, and a relocated layout is the upper end. We price your exact tile and fixture selections so the number does not move later.

How long does a bathroom take?

Two to four weeks for most Ottawa bathrooms. Waterproofing and tile need proper cure time, and rushing either is how leaks start — so we build those days into the schedule rather than skipping them.

How do you waterproof a shower?

Sloped mortar bed or a pre-formed pan, a bonded waterproof membrane over every wet surface, sealed corners and penetrations, and a flood test before a single tile goes on. It is the part you never see and the part that decides whether the bathroom lasts.

Can you fix a bathroom fan that never cleared the steam?

Yes, and it is one of the most common issues we find in older Ottawa homes. We size the fan to the room, duct it properly to the exterior instead of into the attic, and insulate the run so it does not sweat in winter.

Do you handle small bathrooms and powder rooms?

We do. Tight rooms need more planning, not less — fixture clearances, door swing, and tile layout all get worked out on paper before anything is ordered.

Get a fixed, written quote

Tell us about the space and we'll get back to you within one business day.

Request your quote